Enhancing building construction projects delivery: Identifying critical success factors

Authors

  • Guy Igbokwe Federal University of Technology, Owerri, Imo State NIGERIA
  • Emmanuel Ubani Federal University Of Technology PMB 1526 Owerri, NIGERIA
  • Kevin Okorocha Federal University Of Technology PMB 1526 Owerri, NIGERIA
  • Columbus Anyanwu Federal University Of Technology PMB 1526 Owerri, NIGERIA

DOI:

https://doi.org/10.58881/jcmts.v4i1.272

Keywords:

critical success factors (CSFS), critibuilding construction projects, project delivery, constructability, structural equation modelling (SEM), stakeholder involvement, quality control

Abstract

The study is aimed at development of critical success factors for enhance building construction projects delivery using South East Nigeria as a study area.  The problem of the study is failure to identify and prioritize critical success factors (CSFs). The specific objective is to identify and evaluate the critical success factors (CSFs). The basic sources of data collected for the study are secondary data which include brainstorming, published relevant information and primary data gotten by the respondents/professionals. The researcher reviewed related literature which enabled him to develop a questionnaire. Data was collected through email, questionnaire and interview approach which was distributed among the stakeholders.  Analysis of data was carried out with Descriptive Statistics and Structural Equation Modeling (SEM). The results and finding shows that design, pre­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­-construction, construction, post construction phase have an influence on constructability. The researcher concluded that lack of quality control and client dissatisfaction have an influence on constructability. Early involvement of contractors in the design stage and improving the spirit of teamwork have a direct impact on improving constructability and reducing duplication.

Downloads

Download data is not yet available.

References

Albtoush, A. F., & Doh, S. I. (2019). A Review on causes of cost overrun in the construction projects. International Journal of New Innovations in Engineering and Technology, 12(3), 15-22.

Augenbroe G. L.M., Pearce A.R., (2009), Sustainable Construction in the USA: A Perspective to the Year 2010, Int. Conf. on World Futures, February 22–25, Sri Lanka and India.

Baharetha S.M., Al-Hammad A.A., A.H., (2012), Towards a Unified Set of Sustainable Building Materials Criteria, Proc. of the Int. Conf. on Sustainable Design Engineering and Construction.

Barney, J. (1991). Firm Resources and Sustained Competitive Advantage. Journal of Management, 17(1), 99-120. https://doi.org/10.1177/014920639101700108

Bass, B. M. (1985). Leadership and performance beyond expectations. Free Press.

Beck, K., Beedle, M., Bennekum, A. v., et al. (2001). Manifesto for Agile Software Development. Retrieved from https://agilemanifesto.org

Bektas A., (2021), Decomposition of energy-related CO2 emission over 1998-2017 in Turkey, Environmental Engineering and Management Journal.

Belle, I. (2017) The architecture, engineering and construction industry and blockchain technology. In: Digital Culture – Proceedings of the 2017 National Conference on Digital Technologies in Architectural Education and DADA 2017 International Conference on Digital Architecture. Nanjing, China.

Bryde D.J., Brown D., (2005), The influence of a project performance measurement system on the success of a contract for maintaining motorways and trunk roads, Project Management Journal.

Büyüközkan, G. and Göçer, F. (2018) Digital Supply Chain: Literature review and a proposed framework for future research. Computers in Industry.

Cadenazzi T., Dotelli G., Rossini M., Nolan S., Nanni A., (2019), Life-cycle cost and life-cycle assessment analysis at the design stage of a fiber-reinforced polymer-reinforced concrete bridge in Florida, Advances in Civil Engineering Materials.

Chan A.P., Darko A., Ameyaw E.E., Owusu-Manu D. G., (2017), Barriers affecting the adoption of green building technologies, Journal of Management in Engineering.

Chen L., Gao X., Hua C., Gong S., Yue A., (2021), Evolutionary process of promoting green building technologies adoption in China: A perspective of government, Journal of Cleaner Production.

Chen, S., Shi, R., Ren, Z., Yan, J., Shi, Y. & Zhang, J. (2017) A Blockchain-based Supply Chain Quality Management Framework. In: Proceedings of The Fourteenth IEEE International Conference on eBusiness Engineering. Shanghai, China.

Chichoni, J. and Webb, S. (2018). The digital global supply chain: the growing case for blockchain technology expansion within global supply chain. Honors Thesis. Brigham Young University, Provo, UT, USA.

Cox R.F., Issa R.R., Ahrens D., (2003), Management’s perception of key performance indicators for construction, Journal of Construction Engineering and Management.

Coyne, R. and Onabolu, T. (2018) Blockchain for architects: challenges from the sharing economy. Architectural research Quarterly.

Daniel, D. R. (1961). Management information crisis. Harvard Business Review, 39(5), 111-121.

Daniel, R. (1991). Students and magnet schools. Music Educators Journal, 78(4), 7-7. https://doi.org/10.2307/3398325.

Freeman, R. E. (1984). Strategic management: A stakeholder approach. Cambridge University Press.

Hillson, D. (2002). Extending the risk process to manage opportunities. International Journal of Project Management, 20(3), 235-240.

Jadidoleslami, A., Siyadatpanah, A., Borji, H., Zarean, M., Jarahi, L., Moghaddas, E., & Budke, C. M. (2022). Prevalence and Seasonality of Adult and Arrested Larvae of Gastrointestinal Nematodes of Sheep from Mashhad City, Northeastern Iran. Iranian journal of parasitology, 17(2), 214–222. https://doi.org/10.18502/ijpa.v17i2.9539.

Juran, J. M. (1988). Juran on planning for quality. Free Press.

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Wiley.

Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation. American Psychologist, 57(9), 705-717.

Mathar, H., Assaf, S., Hassanain, M.A., Abdallah, A. and Sayed, A.M.Z. (2020). "Critical success factors for large building construction projects: Perception of consultants and contractors", Built Environment Project and Asset Management, Vol. 10 No. 3, pp. 349-367. https://doi.org/10.1108/BEPAM-07-2019-0057

Nworuh G.E. (2004). Basic Research Methodology for researchers trainees and trainers in management sciences (2nd edition): Abix printers Nigeria, Owerri Nigeria.

Ogbu, C. P. and Ebiminor, V. B. (2021). Influence of Project Setting on the Constructability Practices of Indigenous Road Construction Firms in Nigeria. FUTY Journal of the Environment Vol. 15 No. 1 March, 2021.

Rockart, J. F. (1979). Chief executives define their own data needs. Harvard Business Review, 57(2), 81-93.

Shash, A. A., & Almufadhi, S. (2021). Constructability: Owners, Designers, and Contractors Practices in Industrial Projects. Journal of Engineering, Project & Production Management, 11(3).

Downloads

Published

2025-04-01

How to Cite

Igbokwe, G., Ubani, E., Okorocha, K., & Anyanwu, C. (2025). Enhancing building construction projects delivery: Identifying critical success factors. Journal of Commerce, Management, and Tourism Studies, 4(1), 11–22. https://doi.org/10.58881/jcmts.v4i1.272

Issue

Section

Articles

Similar Articles

1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.